Investment Projects in Quang Tri: Capital Flow Overview & Key Portfolio 2026

5/5 - (1 vote)

Quang Tri is announcing a portfolio of over 30 key projects calling for investment in the 2025-2030 period. Strategic capital flows are heavily concentrated on energy (LNG, wind power), logistics infrastructure (seaports, airports), and sustainably developed industrial parks. Notably, Amber Tay Bac Ho Xa Industrial Park project stands out with a clean land fund of 214.77 hectares, a green orientation, and readiness to capture the wave of global supply chain shifts.

Overall Picture & The Shift in FDI Capital Flows

Investment projects in Quang Tri are witnessing a strategic shift from isolated projects to the creation of an interconnected ecosystem: industry – energy – logistics. The completion of infrastructure is opening up immense opportunities to attract high-quality capital.

The 2026 period marks a strong breakthrough for FDI capital flows in Quang Tri. After the merger of Quang Binh and Quang Tri, the economic planning space and land fund for economic development have become more expansive and seamless. The synchronous coordination and supportive policies from IPA Quang Tri are creating a clear legal corridor, enabling large-scale projects to be implemented on schedule and serving as a leverage point for the East-West growth axis.

Detailed Portfolio of Key Investment Projects in Quang Tri

The portfolio of investment projects in Quang Tri currently focuses on 4 main pillars: clean energy, logistics infrastructure, economic zones, and industrial real estate. The total capital scale of these key projects reaches hundreds of trillions of VND.

To seize opportunities, investors need to pay attention to the “nucleus” projects currently being deployed and strongly calling for investment. All legal information and progress can be cross-referenced through the database system on investment licensing management in Quang Tri province.

1. Ongoing Projects Creating Growth Momentum

These are the core infrastructure and energy projects being accelerated for construction in 2026, which will determine the logistics competitiveness of the entire region:

  • Quang Tri Airport Project: Located in Gio Quang, Gio Hai, and Gio Mai communes, the project has a total investment of over 5,821 billion VND. The aircraft apron category is currently being finalized, with expectations for early operation to connect the multimodal transport network.
  • My Thuy Seaport Project: A key project in Hai Lang district. Progress is currently being aggressively pushed, aiming to complete berths No. 1 and No. 2 by early 2026, and to continue procedures for commencing berths No. 3 and No. 4.
  • National Highway 15D Project: An arterial road section from My Thuy Port to the Cam Lo – La Son Expressway, creating a seamless logistics corridor from the international border gate to the seaport.
  • Hai Lang LNG Power Center Project (Phase 1): Designed with a capacity of 1,500 MW and a total investment capital of nearly 54,000 billion VND, playing a role in forming the largest energy center in the region.
  • VSICO Quang Tri Dry Port Project: Located at the Lao Bao International Border Gate, directly serving cross-border customs clearance and warehousing activities.
  • Renewable energy clusters: The Quang Tri wind power industry projects in Huong Hoa and Quang Tri solar power industry projects are continuing to connect to the national grid, providing abundant clean energy for industrial production.

cảng biển mỹ thủy

My Thuy Seaport Project

2. List of Newly Called-for Investment Projects (Period 2025 – 2030)

Alongside the infrastructure under construction, heading towards 2030, the locality has released an investment call portfolio featuring large-scale complex projects:

Project Name Calling for InvestmentLocation / SiteExpected ScaleComplex Objectives
Aviation Industry – Logistics – Airport Urban Service ComplexGio Linh & Cua Viet CommunesUp to 10,800 haEstablish a mega-complex for aviation logistics, cargo transit, and an international service urban area.
Cam Lo Complex Urban, Resort, and Golf Course AreaCam Lo Commune378.88 haThe project has an estimated total investment of 20,000 billion VND, developing high-end sports tourism infrastructure.
Gio Hai Service – Tourism AreaCua Viet Commune13.45 haTotal capital of 3,690 billion VND, exploiting economic and marine tourism advantages.
Cam Lien Industrial Park ProjectCam Hong Commune450 haInvesting in the construction of new Industrial Park infrastructure to expand the land fund.
Green Hydrogen & Semiconductor Material Production CentersDong Nam Economic ZoneDepending on planning scaleBuilding a clean energy production chain, aiming for the Net Zero target and high-tech exports.

The formation of these logistics complexes and mega-projects drives a massive demand for factory premises, strongly accelerating the synchronous development of the Quang Tri industrial park network.

Strategic Highlight: Tay Bac Ho Xa Industrial Park

Standing out in the industrial real estate sector, Amber Tay Bac Ho Xa Industrial Park is a key project with a total capital of 1,250 billion VND covering an area of 214.77 hectares. The project provides a clean land fund and synchronous infrastructure to meet the strict standards of global supply chains.

Located in Vinh Linh commune, Quang Tri province, Tay Bac Ho Xa Industrial Park, invested by Amber Holdings, boasts a position adjacent to both National Highway 1A and National Highway 9D, offering outstanding multimodal transport and logistics advantages. From here, goods can easily circulate to deep-water seaports and international border gates.

The orientation of the project is crystal clear: Amber Tay Bac Ho Xa Industrial Park pioneers the sustainable development trend, specifically targeting green industries. Methodical investments from the wastewater treatment system and power grid to the green landscaping make the infrastructure here perfectly suited to accommodate the shift of industries in Quang Tri such as: textile and garment, footwear, metal production, handicraft production, wood processing, food processing and manufacturing, and mechanical assembly.

To find out details regarding factory layout planning options, investors can directly contact the Hotline: 0813 336 966.

KCN Amber Tây Bắc Hồ Xá
Amber Tay Bac Ho Xa Industrial Park

Project Implementation & Investment Licensing Procedure

The investment process requires enterprises to go through steps from surveying, making proposals, and applying for licenses to construction. Selecting industrial parks with transparent legal status helps shorten the preparation time by 6-12 months.

To ensure the project goes into operation right on schedule, mastering the investment procedure into the industrial park is absolutely essential. The basic sequence includes:

  1. Surveying & Site Selection: Evaluate infrastructure connectivity and attracted industries.
  2. Applying for Investment In-principle Approval: Submit the project proposal dossier to the management agency.
  3. Completing Environmental & Investment Legalities: Prepare the EIA report and apply for the Quang Tri Investment Certificate.
  4. Signing Land Lease Agreement: Receive the handover of the site attached with technical infrastructure.

Commencing Construction: Apply for a construction permit and bring the factory into operation.

Leave a Reply